VDOT News - Staunton

RELEASE:

CONTACT:
IMMEDIATE

Sandy Myers 540-332-9201
Sandy.Myers@vdot.virginia.gov
540-292-2500 (cell)

Ken Slack 540-332-9264
Ken.Slack@vdot.virginia.gov
540-414-5670 (cell)

STA22-175

Dec. 22, 2022



STAUNTON DISTRICT TRAFFIC ALERT FOR DECEMBER 26, 2022 - JANUARY 6, 2023
Highway Work Zones in the VDOT Staunton District

STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.

Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.

ALLEGHANY COUNTY

INTERSTATE 64
No lane closures reported.

PRIMARY ROADS
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Various roads – Flagger traffic control for ditch work, pavement patching, pipe replacement and brush cutting. Mobile traffic control for mowing. Weekdays from 7:30 a.m. to 3 p.m.


BATH COUNTY

PRIMARY ROADS
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.


ROCKBRIDGE COUNTY

INTERSTATE 64
No lane closures reported.

INTERSTATE 81
No lane closures reported.

PRIMARY ROADS
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.

HIGHLAND COUNTY

PRIMARY ROADS
Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads and ditch work. Weekdays from 7:30 a.m. to 3 p.m.


AUGUSTA COUNTY

INTERSTATE 64
No lane closures reported.

INTERSTATE 81
Mile marker 234 to 237, northbound and southbound – Overnight alternating lane closures for survey and soil-testing work, 8 p.m. to 7 a.m. through night of January 30.

PRIMARY ROADS
Route 250 (Hanky Mountain Highway) – Flagger traffic control for road and bridge maintenance between Lismore Lane and Route 715 (Braley Pond Road), 7 a.m. to 6 p.m. through January 13.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Route 601 (Estaline Valley Road) – Flagger traffic control for road and bridge maintenance between Route 811 (Augusta Springs Road) and Route 603 (Pond Gap Lane), 7 a.m. to 6 p.m. through January 27.
Route 795 (Saint James Road) – Flagger traffic control between Route 254 (Hermitage Road) and Route 807 (Farm Draft Lane) for maintenance to bridge over Christians Creek, 7 a.m. to 6 p.m. through March 13.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.


ROCKINGHAM COUNTY

INTERSTATE 81
Mile marker 237 to 238, northbound and southbound – Overnight alternating lane closures for survey and soil-testing work, 8 p.m. to 7 a.m. through night of January 30.
*UPDATE* Mile marker 248 to 250, northbound and southbound – Overnight alternating lane closures for removal of Route 720 overpass bridge, 8 p.m. to 7 a.m. through night of January 5. Northbound slow-roll closures on nights of January 3 – 5. Work is related to Route 720 overpass bridge replacement.

PRIMARY ROADS
Route 33 (East Market Street) – Eastbound lane closures as needed between Route 4106 (MLK Jr. Way) and Burgess Road for shoulder widening, 7 a.m. to 5 p.m. through Friday. Work zone speed limit 25 miles an hour. Traffic restrictions are related to Route 33 bridge replacements and interchange improvement project.
Route 259 (Brocks Gap Road) – Flagger and pilot truck traffic control between Route 612 (Hopkins Gap Road) and West Virginia state line for shoulder widening, milling and paving, 7 a.m. to 5 p.m. through December 30.
Route 259 (West Lee Street, Broadway) – Traffic uses temporary bridge between Route 42 (Main Street) and Route 1411 (Shenandoah Avenue). Work Zone speed limit 25 miles an hour. Traffic restrictions are for Linville Creek bridge replacement. Estimated project completion November 2023.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Route 682 (Friedens Church Road) – Closed between Route 867 (North River Road) and Route 989 (Creekside Drive) for roadway improvements and bridge replacement at Pleasant Run. Follow posted detour. Speed limit on detour route is 25 miles an hour. Flagger traffic control near intersection of Route 867, weekdays from 7 a.m. to 5 p.m. through January 31. Estimated project completion April 2023.
Route 720 (Smithland Road/Old Furnace Road) – Closed between Route 718 (Old Furnace Road) and Route F-238 (Buffalo Drive) for replacement of Route 720 bridge with estimated completion in fall 2023. Follow posted detour.
Route 867 (North River Road) – Flagger traffic control near intersection of Route 682 (Friedens Church Road), weekdays from 7 a.m. to 5 p.m. through December 30. Traffic restrictions are for roadway improvements and bridge replacement at Pleasant Run. Estimated completion April 2023.
Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.


PAGE COUNTY

PRIMARY ROADS
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.


SHENANDOAH COUNTY

INTERSTATE 81
*NEW* Mile marker 267 to 270, northbound – No lane closures but survey work in the right of way, December 27 - 28 from 7 a.m. to 5 p.m.

PRIMARY ROADS
Route 11 (Main Street, Mount Jackson) – Northbound shoulder closures with traffic shifted to center lane for curb and gutter work, southbound lane closures as needed. Work zone is between Route 292 (Conicville Road) and Route 1316 (Avondale Avenue), through July 31.
Route 11 (Old Valley Pike) – Flagger traffic control as needed between Route 720 (Wissler Road) and Mount Jackson town limits, weekdays from 7 a.m. to 5 p.m. Work zone speed limit 45 miles an hour. Traffic restrictions are for replacement of North Fork Shenandoah River bridge. Estimated completion August 2023.

SECONDARY ROADS
Various roads – Flagger traffic control for tree trimming. Weekdays during daylight hours.

FREDERICK COUNTY

INTERSTATE 81
Mile marker 300 to 301, northbound and southbound – Overnight left lane closures for equipment unloading, 8 p.m. to 7 a.m. through night of December 29.

PRIMARY ROADS
Route 11 (Main Street, Middletown) – Alternating lane closures for storm sewer installation between Route 627 (Reliance Road) and Skirmisher Lane, 9 a.m. to 3:30 p.m. through January 6, 2023.
*UPDATE* Route 37 – Northbound right shoulder closures between Route 622 (Cedar Creek Grade) interchange and Route 50 (Northwestern Turnpike) interchange for traffic sensor installation, January 3 – 6 from 7 a.m. to 7 p.m.

SECONDARY ROADS
Route 627 (Reliance Road) – Alternating lane closures for turn lane construction between Route 11 (Main Street, Middletown) and Route 1116 (Carolyn Avenue), 9 a.m. to 3:30 p.m. through January 6, 2023.
Various roads – Alternating lane closures on Route 657 (Senseny Road), Route 736 (Rossum Lane), Route 867 (Twinbrook Circle) and Route 868 (Glenridge Drive) just west of Clarke County line for road improvements and utility work, 9 a.m. to 3:30 p.m. through January 6, 2023.


CLARKE COUNTY

PRIMARY ROADS
*NEW* Route 7 (Harry Byrd Highway) – Westbound right lane closures between FR-709 (Parker Lane) and Route 603 (Castleman Road) for inspection of bridge over Shenandoah River, December 28 from 8 a.m. to 4 p.m.

SECONDARY ROADS
No lane closures reported.


WARREN COUNTY

INTERSTATE 66
No lane closures reported.

INTERSTATE 81
Mile marker 299 to 300, northbound and southbound – Overnight left lane closures for equipment unloading, 8 p.m. to 7 a.m. through night of January 5.

PRIMARY ROADS
No lane closures reported.

SECONDARY ROADS
No lane closures reported.

Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.

To obtain traffic alerts and traveler information, dial 511 or go to http://www.511Virginia.org. The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov/. Agents are available 24 hours-a-day, seven days a week.

The Staunton District Twitter feed is at @VaDOTStaunton. Follow VDOT on Facebook, Flickr, Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at http://www.VirginiaDOT.org.

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Aug. 29, 2023