VDOT News - Staunton

RELEASE:

CONTACT:
IMMEDIATE

Sandy Myers 540-332-9201
Sandy.Myers@vdot.virginia.gov
540-292-2500 (cell)

Ken Slack 540-332-9264
Ken.Slack@vdot.virginia.gov
540-414-5670 (cell)

STA21-129

Oct. 8, 2021



STAUNTON DISTRICT TRAFFIC ALERT FOR OCTOBER 11 – 15, 2021
Highway Work Zones in the VDOT Staunton District

STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.

Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.


ALLEGHANY COUNTY

INTERSTATE 64

*NEW* Mile marker 16 to 19 including exit 16B, eastbound and westbound – Alternating lane closures for paving operations, October 11-29 from 6 a.m. to 7 p.m.
*NEW* Mile marker 20 to 24 including exit 21, eastbound and westbound – Shoulder closures along I-64 and off-ramps to Route 696 for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
Mile marker 30 to 29, westbound – Alternating lane closures for maintenance of bridge over Route 42. Work may take place during daytime and nighttime hours through October 22.

PRIMARY ROADS
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, shoulder repairs and asphalt patching. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacements, ditch work and pavement patching. Weekdays from 7:30 a.m. to 3 p.m.


BATH COUNTY

PRIMARY ROADS
Various roads – Flagger traffic control for pavement patching. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Route 678 (Indian Draft Road) – Flagger traffic control between Route 39 (Mountain Valley Road) and 3.7 miles north of Route 39 for paving operations, 6:30 a.m. to 8:30 p.m. through October 15.
Route 687 (Jackson River Turnpike) – Stop-and-proceed traffic pattern near intersection with Route 615 (Main Street) for culvert replacement. Estimated completion on October 28.
Various roads – Mobile lane closures for mowing operations. Flagger traffic control for pavement patching and ditch work. Weekdays from 7:30 a.m. to 3 p.m.


ROCKBRIDGE COUNTY

INTERSTATE 64
Mile marker 53 to 55, eastbound – Alternating lane closures for bridge painting operations, 6:30 a.m. to 8:30 p.m. through October 30.

INTERSTATE 81
*NEW* Mile marker 179 to 182 including exit 180, northbound and southbound – Shoulder closures along I-81 and off-ramps to Route 11 for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
*NEW* Exit 188B, northbound – Shoulder closures along off-ramp to Route 60 westbound for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
*NEW* Mile marker 193 to 197 including exit 195, northbound and southbound – Shoulder closures along I-81 and off-ramps to Route 11 for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
*NEW* Mile marker 203 to 205 including exit 205, northbound and southbound – Shoulder closures along I-81 and off-ramps to Route 606 for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
Exit 205, southbound – Off- and on-ramp shoulders closed 24/7 for interchange improvements with estimated completion in fall 2022.

PRIMARY ROADS
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Route 606 (Raphine Road) – Occasional flagger traffic control in area of I-81 ramps for interchange improvements with estimated completion in fall 2022.
*NEW* Route 706 (Borden Grant Trail) – Shoulder closures just south of Route 714 (Mackeys Lane) for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.


HIGHLAND COUNTY

PRIMARY ROADS
*UPDATE* Route 84 (Mill Gap Road) – Alternating lane closures between Route 220 (Jackson River Road) and West Virginia state line for paving operations, 6 a.m. to 6 p.m. through October 22.
*NEW* Route 250 (Highland Turnpike) – Shoulder closures between Route 615 (Davis Run Road) and Route 649 (Myers-Moon Road) for utility work, October 11-28 from 9 a.m. to 2:30 p.m.
Various roads – Flagger traffic control for pavement patching, tractor mowing and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS
Various roads – Flagger traffic control for pipe cleaning, tree removal, pavement patching, ditch work, tractor mowing, and adding stone to unpaved roads. Weekdays from 7:30 a.m. to 3 p.m.


AUGUSTA COUNTY

INTERSTATE 64
*NEW* Mile marker 100 to 98, westbound – Right shoulder closures for shoulder repairs, Monday and Tuesday from 8 a.m. to 5 p.m.
*NEW* Mile marker 100 to 99, westbound – Overnight left lane closures for installation of flashing chevrons, Monday to Wednesday nights from 7 p.m. to 7 a.m.

INTERSTATE 81
*NEW* Mile marker 207 to 206, southbound – Shoulder closures for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
*NEW* Mile marker 219 to 221, southbound – Shoulder closures for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
*NEW* Mile marker 224 to 226, northbound and southbound – Overnight single-lane closures for inspection of bridges over Lewis Creek, 8 p.m. Tuesday to 7 a.m. Wednesday.
*NEW* Mile marker 225 to 223, southbound – Right shoulder closures for shoulder repairs, Wednesday and Thursday from 8 a.m. to 5 p.m.
*UPDATE* Mile marker 229 to 228, southbound – Overnight single lane closures for maintenance of Middle River bridge, Monday through Thursday nights from 8 pm. to 7 a.m.

PRIMARY ROADS
Route 11 (Lee-Jackson Highway) – Alternating lane closures between Route 340 (Stuarts Draft Highway) and Route 662 (Stover School Road) for paving operations, 6:30 a.m. to 8:30 p.m. through October 20.
Route 11 (Lee-Jackson Highway) – Alternating lane closures between Route 666 (Lofton Road) and Route 667 (Dabneys Road) for paving operations, 6:30 a.m. to 8:30 p.m. through October 13.
*NEW* Route 42 (Buffalo Gap Highway) – Alternating lane closures between Route 250 (Churchville Avenue) and Route 725 (Whiskey Creek Road) for paving operations, October 13-November 15 from 6:30 a.m. to 8:30 p.m.
Route 42 (Little Calfpasture Highway) – Alternating lane closures between Route 688 (Old Parkersburg Turnpike) and Route 811 (Augusta Springs Road) for tree removal operations, Monday to Friday from 7 a.m. to 4:30 p.m.
Route 254 (Hermitage Road) – Flagger traffic control for paving operations between Route 642 (Barrenridge Road) and Waynesboro city limits, 6:30 a.m. to 8:30 p.m. through October 27.
*NEW* Route 262 (Woodrow Wilson Parkway) – Southbound shoulder closures just south of Route 254 (Parkersburg Turnpike) interchange for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
Route 340 (Stuarts Draft Highway) – Flagger traffic control for paving operations between Route 657 (Indian Ridge Road) and Route 652 (University Farm Road), 6:30 a.m. to 8:30 p.m. through November 2.

SECONDARY ROADS
*UPDATE* Route 610 (Howardsville Turnpike) – Shoulder closures for water-line installation between Route 660 (Lake Road) and Route 848 (Rankin Lane), 8 a.m. to 5 p.m. through October 28.
Route 646 (Fadley Road) – Shoulder closures for tree-trimming operations between Route 696 (Stonewall Road) and Route 749 (Burkes Mill Road), 8:30 a.m. to 2:30 p.m. through October 18.
Route 675 (Broadhead School Road) – Flagger traffic control as needed for Rural Rustic Road improvements between Route 674 (Pilson Road) and Route 670 (Wagon Shop Road), Monday to Friday from 8 a.m. to 5 p.m. through November 2021.
Route 696 (Stonewall Road) – Shoulder closures for tree-trimming operations between Route 749 (Croushorn Lane) and Route 646 (Fadley Road), 8:30 a.m. to 2:30 p.m. through October 18.
Route 696 (Flint Hill Road) – Shoulder closures for tree-trimming operations between Route 748 (Flint Hill Road) and Route 852 (Burkes Mill Road), 8:30 a.m. to 2:30 p.m. through October 18.
Route 703 (Hewitt Road) – Closed between Route 708 (Eidson Creek Road) and Route 876 (Swoope Road) for replacement of Eidson Creek bridge. Follow posted detour. Estimated completion April 2022.
Route 728 (Stover Shop Road) – Road closed between Route 730 (Stribling Springs Road) and Route 759 (Oak Hill Road) for bridge work at Moffett Creek. Follow posted detour. Estimated completion October 14.
Route 749 (Burkes Mill Road) – Shoulder closures for tree-trimming operations between Route 696 (Stonewall Road) and Route 646 (Fadley Road), 8:30 a.m. to 2:30 p.m. through October 18.
Route 842 (Horseshoe Circle) –¬¬ Flagger traffic control as needed for Rural Rustic Road improvements between Route 608 (Cold Springs Road) and 1 mile south of Route 608, weekdays from 8 a.m. to 4 p.m. through November 30.
Route 852 (Burkes Mill Road) – Shoulder closures for tree-trimming operations between Route 804 (Salem Church Road) and Route 696 (Flint Hill Road), 8:30 a.m. to 2:30 p.m. through October 18.


ROCKINGHAM COUNTY

INTERSTATE 81
*NEW* Mile marker 238 to 243, northbound – Overnight single-lane closures for pavement patching, Friday through Sunday nights (October 15-17) from 8 p.m. to 7 a.m.
*NEW* Mile marker 242 to 249, northbound and southbound – Mobile shoulder closures for survey operations, Monday to Friday from 7 a.m. to 5 p.m.
Mile marker 243 to 240, southbound – Overnight alternating lane closures for paving operations, 8 p.m. to 7 a.m. through October 15.
Mile marker 248 to 252, northbound – Overnight alternating lane closures for paving operations, 7 p.m. to 7 a.m. through October 16.
*NEW* Mile marker 251 to 240 including exit 240, southbound – Overnight single-lane closures for pavement patching, Thursday and Friday nights from 8 p.m. to 7 a.m. Work at exit 240 off-ramp requires overnight ramp closure with detour.
*NEW* Mile marker 263 to 264 including exit 264, northbound – Overnight single-lane closures for pavement patching, Saturday through Monday nights (October 16-18) from 8 p.m. to 7 a.m. Work at exit 264 off-ramp requires overnight ramp closure with detour.

PRIMARY ROADS
Route 33 (Spotswood Trail) – Mobile lane closures for line-painting operations between Green County line and Route 634 (Sapling Ridge Road), 8 a.m. to 5 p.m. through October 12.
*NEW* Route 33 Business (West Spotswood Trail, Elkton) – Closed October 11-14 between North Terrace Avenue and Fifth Street for railroad crossing repairs. Follow posted detour.
Route 42 – Mobile lane closures for line-painting operations between Augusta County line and Shenandoah County line, Tuesday to Saturday from 8 a.m. to 5 p.m.
Route 257 (Dinkel Avenue) – Mobile lane closures for line-painting operations between Bridgewater town limits and Route 11 (Valley Pike), 8 a.m. to 5 p.m. through October 12.

SECONDARY ROADS
No lane closures reported.


PAGE COUNTY

PRIMARY ROADS
Route 211 – Single-lane traffic between Route 615 (Egypt Bend Road) and Route 646 (Oak Leaf Road). Westbound traffic uses median crossover to share eastbound bridge over Shenandoah River South Fork. Work zone speed limit 45 miles an hour. Traffic restrictions are for westbound bridge replacement with estimated completion in summer 2022.

SECONDARY ROADS
Route 759 (Jollett Road) – Stop-and-proceed traffic pattern for bridge work near intersection with Route 607 (Weaver Road). Vehicle width restriction of 11 feet 6 inches during construction. Estimated completion October 28.


SHENANDOAH COUNTY

INTERSTATE 81
*NEW* Mile marker 269 to 270, northbound and southbound – Alternating lane closures for utility work, October 17 from 7 a.m. to 9 a.m.
*UPDATE* Mile marker 273 to 272, southbound – Overnight alternating lane closures for maintenance of bridge over Route 263 and Mill Creek, 8 p.m. to 7 a.m. through October 15.
Mile marker 291 to 292, northbound – Right shoulder closed 24/7 near on-ramp from exit 291 due to ramp extension work. Estimated completion November 11.
Mile marker 295 to 298, northbound – Overnight alternating lane closures for paving operations, 8 p.m. to 7 a.m. through October 22.
Mile marker 297 to 296, southbound – Right shoulder closed 24/7 near on-ramp from exit 296 due to ramp extension work. Estimated completion November 11.

PRIMARY ROADS
*UPDATE* Route 211 (New Market Road) – Mobile lane closures for line-painting operations between Rockingham County line and I-81 interchange at New Market, 8 a.m. to 5 p.m. through October 13.

SECONDARY ROADS
No lane closures reported.

FREDERICK COUNTY

INTERSTATE 81
Mile marker 302 to 304, northbound – Right shoulder closed 24/7 at DMV truck weigh station for off-ramp extension. Scales closed until completion of project, scheduled for November 11.
*UPDATE* Mile marker 313 to 314, northbound and southbound – Overnight lane closures as needed for maintenance of Route 17/40/522 bridge, 8 p.m. to 7 a.m. through October 15.

PRIMARY ROADS
*UPDATE* Route 50/17 (Millwood Pike) – Eastbound and westbound overnight lane closures as needed in the area of I-81 interchange for bridge maintenance, 8 p.m. to 7 a.m. through October 15.
*NEW* Route 277 (Fairfax Street, Stephens City) – Shoulder closures between Route 11 (Valley Pike) and Route 1002 (Mulberry Street) for sign maintenance, Monday to Friday from 8 a.m. to 5 p.m.
Route 277 (Fairfax Pike) – Both shoulders closed 24/7 between I-81 ramps and Route 1075 (Nottoway Drive) for roadway and utility reconstruction project with completion in late 2022.
Route 522 (Front Royal Pike) – Southbound traffic uses median crossovers between Route 644 (Parkins Mill Road) and Route 1054 (Clydesdale Drive) to share northbound Opequon Creek bridge. Northbound and southbound traffic limited to one lane. Work zone is for bridge replacement with completion scheduled for September 2022.
Route 522 (North Frederick Pike) – Alternating lane closures for pavement resurfacing between Route 692 (Chapel Hill Road) and Route 705 (Ebenezer Church Road), 7 a.m. to 6 p.m. through October 29.
Route 522 (North Frederick Pike) – Shoulder closures for utility work between Route 739 (Apple Pie Ridge Road) and Route 654 (Cedar Grove Road), 6:30 a.m. to 6 p.m. through November 25.

SECONDARY ROADS
Route 600 (Hayfield Road) – Occasional lane closures for utility work between Route 50 (Northwestern Pike) and Route 753 (Rosenberger Lane), 6:30 a.m. to 5 p.m. through October 21.
Route 779 (Country Club Circle) – Flagger traffic control between Route 657 (Senseny Road) and Route 1216 (Lewis Circle) for utility work, 8 a.m. to 4 p.m. through November 19.
Various roads – Alternating lane closures on Route 657 (Senseny Road), Route 736 (Rossum Lane) and Route 867 (Twinbrook Circle) just west of Clarke County line for roadway and utility work, Monday to Friday from 9 a.m. to 3:30 p.m.


CLARKE COUNTY

PRIMARY ROADS
No lane closures reported.

SECONDARY ROADS
No lane closures reported.


WARREN COUNTY

INTERSTATE 66
*NEW* Mile marker 5 to 6, eastbound and westbound – Brief slow-roll closures for overhead utility work, Sunday (October 10) between 6 a.m. and 1 p.m.
Mile marker 6 to 14, eastbound and westbound – Overnight alternating lane closures for maintenance of various bridges, Monday through Thursday nights from 8 p.m. to 4 a.m.

INTERSTATE 81
No lane closures reported.

PRIMARY ROADS
*NEW* Route 340 (Shenandoah Avenue) – Northbound and southbound right lane closures between Front Royal town limits and Route 55 (Strasburg Road) for inspection of bridge over South Fork Shenandoah River, 8 p.m. Tuesday to 5 a.m. Wednesday.

SECONDARY ROADS
Route 624 (Happy Creek Road) – Flagger traffic control between Front Royal eastern town limits and Route 647 (Dismal Hollow Road) for safety improvement project, 9 a.m. to 3 p.m. daily. Estimated project completion December 10.

Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.

To obtain traffic alerts and traveler information, dial 511 or go to http://www.511Virginia.org. The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia’s roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov/. Agents are available 24 hours-a-day, seven days a week.

The Staunton District Twitter feed is at @VaDOTStaunton. VDOT can be followed on Facebook, Flickr, Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at http://www.VirginiaDOT.org.

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: June 2, 2023