VDOT News - Northern Virginia
RELEASE: CONTACT: |
IMMEDIATE Ellen Kamilakis 703-638-2595 |
NR21-100 Dec. 2, 2021 |
Fleetwood Road Daytime Closures in Aldie Dec. 7-10
Daytime closures extended to Dec. 13-14
Update: The daytime closures of Fleetwood Road have been extended, weather permitting, to Monday, Dec. 13 and Tuesday, Dec. 14 between 9 a.m. and 3 p.m. each day.
ALDIE – Fleetwood Road (Route 616) between Route 50 and Nicholson Meadows Place/Revival Drive will be closed to through traffic, weather permitting, Tuesday, Dec. 7 through Friday, Dec. 10 between 9 a.m. and 3 p.m. each day for pavement patching, according to the Virginia Department of Transportation.
Those needing to reach properties along the closed quarter-mile section of Fleetwood Road will have access.
Through traffic will be detoured via Route 50, Lenah Ridge Place, Meadow Wheel Drive and Nicholson Meadows Place back to Fleetwood Road.
Drivers, cyclists and pedestrians are reminded to use caution when traveling in active work zones. Be alert to new traffic patterns and limit distractions.
You can get real-time traffic, work zone and incident information online at 511virginia.org, via the free mobile 511Virginia app, or by calling 511 in Virginia anywhere anytime.
Follow VDOT Northern Virginia on Twitter: @vadotnova
END
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.