VDOT News - Northern Virginia

RELEASE:

CONTACT:
IMMEDIATE

Michelle Holland 703-586-0487
Michelle.Holland@vdot.virginia.gov

NOVA-167673

Sept. 23, 2020



Traffic Pattern Change at Ramp from Route 28 North to I-66 East Starting on or about September 26

FAIRFAX – The current ramp from Route 28 North to I-66 East will close beginning on or about Saturday, September 26, and be replaced by a new, temporary ramp about 250 feet farther north on Route 28. As part of this traffic pattern change, travel lanes on Route 28 North and on the ramp from Route 29 (Lee Highway) South to Route 28 North will be shifted slightly. These changes are part of several traffic pattern changes happening this year in the I-66 and Route 28 Interchange area as part of the Transform 66 Outside the Beltway Project.

This traffic pattern will be in place while the new northbound Route 28 thru-lanes and additional ramps for the redesigned interchange are constructed. Drivers should use caution and follow roadway signs when traveling in this area.

The new Route 28 and I-66 Interchange will improve traffic flow on I-66 and Route 28, and provide access to and from the future I-66 Express Lanes. The I-66 Outside the Beltway Express Lanes, which span from I-495 to Route 29 in Gainesville, are expected to open in December 2022.

Weekly updates are available at Transform66.org and on Twitter @VaDOTNOVA. To receive updates automatically by email, sign up here

All work is weather dependent and will be rescheduled if inclement conditions occur.

###



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Aug. 17, 2023