VDOT News - Northern Virginia

RELEASE:

CONTACT:
IMMEDIATE

Mike Murphy
michael.murphy@vdot.virginia.gov

NR19-102

Oct. 18, 2019



Daytime Closure of Scotts Crossing Road in Tysons October 19
Detours in place during Jones Branch Connector work


TYSONS – Scotts Crossing Road between Jones Branch Drive and the 495 Express Lanes off-ramps will be closed Saturday, Oct. 19 from 5 a.m. to 3:30 p.m. for paving as part of the Jones Branch Connector project, according to the Virginia Department of Transportation.

The following detours will be in place:

  • 495 Express Lanes to Jones Branch Drive via Scotts Crossing Road: Scotts Crossing Road, Route 123, Tysons Boulevard, Galleria Drive and Westpark Drive back to Jones Branch Drive
  • Northbound Jones Branch Drive to 495 Express Lanes via Scotts Crossing Road: Jones Branch Drive, Westbranch Drive and Westpark Drive back to the 495 Express Lanes.
  • Southbound Jones Branch Drive to 495 Express Lanes via Scotts Crossing Road: Jones Branch Drive and Westpark Drive back to 495 Express Lanes.
  • Southbound Route 123 to Southbound 495 Express Lanes via Scotts Crossing Road: Route 123, Tysons Boulevard, Galleria Drive and Westpark Drive back to the 495 Express Lanes.
  • Northbound Jones Branch Drive to Route 123 via Scotts Crossing Road: Jones Branch Drive, Westbranch Drive, Westpark Drive, Galleria Drive and Tysons Boulevard back to Route 123.
  • Southbound Jones Branch Drive to Route 123 via Scotts Crossing Road: Jones Branch Drive, Westpark Drive, Galleria Drive and Tysons Boulevard back to Route 123.
  • Southbound Route 123 to Jones Branch Drive via Scotts Crossing Road: Route 123, Tysons Boulevard, Galleria Drive and Westpark Drive back to Jones Branch Drive.

The ramps from the northbound and southbound 495 Express Lanes to Scotts Crossing Road will remain open and traffic may still access Route 123 via eastbound Scotts Crossing Road. Route 123 traffic may still access the northbound 495 Express Lanes via westbound Scotts Crossing Road.

The Jones Branch Connector project partially opened to traffic in December. Two lanes in each direction will open by the end of the year, with final project completion in early 2020.
                                 
Follow VDOT Northern Virginia on Twitter: @vadotnova.

                                                                                               END



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: May 19, 2023