VDOT News - Lynchburg
RELEASE: CONTACT: |
IMMEDIATE Len Stevens 434-856-8176 len.stevens@vdot.virginia.gov |
LYN-191990 March 4, 2022 |
UPCOMING BRIDGE REPAIR ON ROUTE 726 (MT. ATHOS RD.) TO AFFECT TRAFFIC FOR SEVERAL WEEKS
Lynchburg, Va. – On Monday, March 7, 2022, traffic on Route 726 (Mt. Athos Road) will be reduced to one lane over Beaver Creek due to needed bridge repairs. Crews will establish a single, 11-foot wide lane, with a temporary traffic barrier wall and temporary signal lights. This repair work is expected to last approximately 90 days.
Due to the high volume of vehicles that travel on Route 726 (Mt. Athos Road) daily, significant traffic backups can be expected. If possible, motorists are encouraged to find an alternate path to their destination.
(END)
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.